Reston is not a town. It is an unincorporated community in Fairfax County with no town government and no municipal permit office, so zoning review, the building permit and every inspection come from Fairfax County. What Reston has instead is a covenant layer that most of Northern Virginia does not. Reston Association's Design Review Board reviews exterior alterations and additions on properties within Reston Association, most clusters carry their own standards on top of that, and much of Reston is zoned PRC, Planned Residential Community, where your setbacks come from an approved development plan rather than a table in the ordinance. DLA Design and Build sequences all of it and builds the addition.
The county sets the code. The covenants set the design. Both have to be answered before work starts.

Tell Us About Your Project

Fill out the form below and we will call you back to talk about your project.

Why Reston Homeowners Choose to Expand and Renovate

Reston has been building since 1964, and the thing that makes it worth staying in is also the thing you cannot buy again. Reston Association covers more than 22,000 residential units and over 1,300 acres of open space, four lakes, three ponds, 55 miles of paved pathways and a 72-acre nature education center. Selling and buying a few streets over usually means the same covenants, the same era of floor plan and current pricing, with the renovation still ahead of you. Building onto the house you own keeps the pathway network, the tree canopy and the lot, and fixes the plan.
Then there is the housing itself. Reston's five village centers went in over decades, starting with Lake Anne in the mid 1960s and continuing through Hunters Woods, Tall Oaks, South Lakes and North Point, and the houses around them were designed for a way of living that assumed smaller households, compartmentalized kitchens and fewer bathrooms. The structure is generally sound and the siting is generally good. What is missing is space in the right places, which is exactly what an addition fixes.

Home Additions We Build in Reston, VA

DLA Design and Build works across Reston, from the wooded cluster lots around Lake Anne to the larger single-family parcels near South Lakes and North Point. Every project starts by confirming what Reston Association and your cluster require and what the county's records say about your lot.

Room & Rear Additions We design room and rear additions for Reston lots, sized to the setbacks Fairfax County confirms for your parcel. In a PRC district those are not in the ordinance tables, so we request them from the county's Zoning Permits Section rather than assume them from the district name. Find Out More Second-Story Additions A second story adds bedrooms and a bath without touching the footprint, which matters on the small cluster lots where the buildable area is already tight and common open space sits close behind. We assess the existing foundation and first-floor framing before recommending it, then take the massing and roof form to the Design Review Board. Find Out More Primary Suite Additions Reston's 1960s and 1970s plans rarely included a primary suite worth the name. We add a properly sized bedroom, full bath and closet, laid out so the rest of the house stays livable through construction. Major additions go to a DRB Panel or the Full Design Review Board rather than staff review. Find Out More In-Law & Multigen Suites We design attached in-law and multigenerational suites with a private bedroom, bath and sitting area, plus step-free entry where the grade allows. Fairfax County zoning decides whether a proposed suite counts as an accessory dwelling unit, and we confirm that before the layout is fixed. Find Out More Sunrooms & Bump-Outs Sunrooms and bump-outs bring light into rooms that were built with small windows and heavy tree cover outside them. Sunrooms and screened porches are among the application types Reston Association routes to a DRB Panel or the Full Board, so we budget the review cycle rather than treating it as a formality. Find Out More Garage Additions We build attached and detached garage additions in Reston, working to the setbacks the county confirms for your parcel and to your cluster's standards for driveway material, paving and screening. Where the work needs a tree removed, that is a separate Design Review Board item. Find Out More

Our Experience Working in Reston Neighborhoods

There is no municipal step here, and that is the first thing to get straight. Reston is a census-designated place in Fairfax County, not an incorporated town, so there is no Town of Reston, no town zoning ordinance and no town permit. Fairfax County provides the governing services, Fairfax County zoning governs the lot, and Fairfax County Land Development Services issues the addition permit and the trade permits and performs the inspections. Where Reston differs from the rest of Fairfax County is the zoning district. Most of Reston is PRC, Planned Residential Community, one of only three PRC districts in the county, and PRC lots do not take their setbacks from the Article 2 district tables. The county's own guidance says setbacks for residential lots in P-Districts have to be requested from the Zoning Permits Section, and that the distance from a proposed addition to your property lines is governed by the zoning district and any applicable proffered or development conditions or development plan. That is why we request the parcel's setbacks in writing at the start instead of scaling them off a plat. Cluster development also means your rear property line is often much closer to the house than the open space behind it suggests, because that open space belongs to Reston Association rather than to you.
The covenant layer runs alongside the county. The Design Review Board is an independent agency of Reston Association that administers the Design Covenants in the Reston Deed of Dedication, and most exterior alterations or additions, no matter how large or small and including tree removal, require approval from either the DRB or Reston Association Covenants staff before the work is implemented. Major additions, sunrooms, screened porches, pools and any application with an affected party go to a DRB Panel or the Full Design Review Board, which meets on the third Tuesday of the month, with decisions sent about a week after the meeting. An application needs the signatures of at least three property owners adjacent to or within view of the work, and if the property sits in a cluster association at least one of those signatures has to be a cluster officer. Clusters have their own standards reviewed by the DRB alongside the design guidelines, and where a project conforms to DRB-approved cluster standards it often does not need an individual application at all. Approved work has to begin within six months and be substantially complete within eighteen. Two more parcel-level checks matter here. Any tree over four inches in diameter at breast height needs permission before removal, which affects staging and access as much as the footprint. And Fairfax County is a Tidewater locality under the Chesapeake Bay Preservation Act, so lots near Snakeden Branch, The Glade or Colvin Run can carry a 100-foot Resource Protection Area buffer. We check all of it before drawings are finalized.

Frequently Asked Questions About Home Additions in Reston, VA

Fairfax County, and only Fairfax County. Reston is a census-designated place and an unincorporated area with no town government, so there is no Town of Reston, no municipal zoning ordinance and no municipal permit office. Fairfax County provides the governing services for Reston, county zoning governs your lot, and Fairfax County Land Development Services issues the addition and alteration permit along with the separate electrical, plumbing and mechanical trade permits, reviews the plans and performs every inspection from footing to final. Reston Association approval is a separate matter and is not a permit. It is a covenant approval under the Reston Deed of Dedication, administered by the Design Review Board, and it does not replace or satisfy any county requirement. Both have to be in hand before work starts, and the practical order is to design once, submit to the Design Review Board and to the county in parallel where the drawing set allows, and hold demolition until both come back. We manage the county process on your behalf and prepare the Design Review Board package as part of the design phase.

If your property is subject to the Reston Deed, yes on both counts. The Design Review Board is an independent agency of Reston Association responsible for reviewing exterior alterations and improvements of properties within Reston Association, and Reston Association's own guidance is that most exterior alterations or additions, no matter how large or small and including tree removal, require review and approval by either the Design Review Board or Reston Association Covenants staff before implementation. An addition is not a staff-level item. Swimming pools, screened porches, sunrooms, major additions, applications with affected parties, appeals and applications from builders and associations must be reviewed by a DRB Panel or the Full Design Review Board, which meets on the third Tuesday of the month at 7 pm, with panel and full board decisions sent about a week after the meeting. A complete application includes a written description of the work, materials and colors, scaled elevations, a site plan, photographs of existing conditions, and the signatures of at least three property owners adjacent to or within view of the work. If your home is in a cluster association, at least one of those signatures has to be a cluster officer, and your cluster's own standards apply on top of the Reston Association design guidelines. Those cluster standards are themselves reviewed by the DRB, and where a project conforms to DRB-approved cluster standards it often does not need an individual application. We confirm your parcel's status and prepare both packages.

You ask the county, and that is not a shortcut. Most of Reston is zoned PRC, Planned Residential Community, one of only three PRC districts in Fairfax County, and PRC is a planned district rather than a conventional residential one. Fairfax County's published guidance states that setbacks for residential lots in P-Districts, meaning districts starting with P, must be requested from the county's Zoning Permits Section, because they are not in the district tables in Article 2 of the Zoning Ordinance. The county also states that the distance from any proposed addition to your property lines is regulated by the setback requirements for the zoning district and any applicable proffered or development conditions or development plan. In practice that means your buildable envelope was set decades ago by the approved development plan for your section of Reston, not by a number you can look up. There is a second consequence that catches Reston homeowners more often than the first. Cluster development put houses on small lots with shared open space around them, and much of that open space belongs to Reston Association. The woods behind your house are frequently not your yard, and your rear property line can be a good deal closer to the back wall than it looks. We request the setbacks for your parcel in writing and confirm the property line against the plat before a footprint is drawn.

The lot usually answers it. On a cluster lot where the buildable area is tight and Reston Association open space sits close behind the house, a rear addition can run out of room before it runs out of budget, and a second story adds bedrooms and a bath without consuming any ground. On a larger single-family parcel near South Lakes or North Point there is often real depth to work with and a rear addition is easier to live through and avoids a roof tear-off. Two Reston-specific factors sit on top of that. Trees over four inches in diameter at breast height need permission before removal, so a rear footprint that requires clearing is a bigger application than one that does not, and access and staging matter as much as the addition itself on a wooded lot. And the Design Review Board will look harder at a change to roof line and overall massing than at a single-story addition set behind the house, so a second story is the more demanding review even when it is the better building. We run a structural assessment of the existing foundation and first-floor framing, confirm the parcel's setbacks with the county, and check whether any part of the lot falls in a Resource Protection Area buffer along Snakeden Branch, The Glade or Colvin Run before recommending either.

Plan for two phases that partly overlap. Design and approvals in Reston generally run two to four months. Fairfax County plan review sits on one track and Reston Association design review sits on the other, and unlike an incorporated town the two are not strictly sequential, so a complete drawing set can go to both. What sets the covenant track's pace is the calendar: an addition goes to a DRB Panel or the Full Design Review Board rather than staff, the Full Board meets on the third Tuesday of the month, and decisions are sent about a week after the meeting, so budget one to two months and more if the board asks for changes and the item returns. Once approved, the work must begin within six months and be substantially complete within eighteen. Construction runs about three to five months for a single-story rear addition, sunroom or screened porch and five to nine months for a second story, a primary suite wing or an in-law suite with a full bath and mechanical work. If any part of the lot sits in a Resource Protection Area buffer, add time in the pre-construction phase. You get a dated schedule once the setbacks are confirmed and the covenant status is settled.

Reston was designed as a set of deliberate architectural statements, and the additions that fail here are the ones that import a style from somewhere else. Around Lake Anne the vocabulary is mid-century modern and Brutalist, with flat and low-slope roofs, concrete and brick, deep overhangs and horizontal window bands, and the Lake Anne Village Center itself has been a Fairfax County Historic Overlay District since 1983 and has been listed on the National Register of Historic Places since 2017, which means exterior alterations requiring a building permit there also need a Certificate of Appropriateness from the county's Architectural Review Board. In the 1970s and 1980s contemporaries elsewhere in Reston, the details that carry are the roof slope, the siding orientation and reveal, the trim depth around openings, and the window proportion, because a contemporary house is much less forgiving of a wrong proportion than a colonial is. The Design Review Board evaluates the same things, so matching well and passing review are the same job rather than two. We document existing conditions with photographs and measurements at the start, specify materials and colors to match rather than approximate, and detail the transition before framing instead of after.

GOOGLE REVIEWS

What Our Clients Say

Real feedback from homeowners across Northern Virginia. We're proud of the relationships we build, project by project.

5.0 Average Rating
★★★★★
45+ Five-Star Reviews

How We Keep Reston Projects Efficient and Predictable

Addition projects are disruptive by nature, and the families we work with in Reston are living in the home during most of the build. We structure the work sequence to limit the period when major systems are open or exterior walls are exposed, communicate the schedule in plain terms before each phase, and keep the site clean and secured throughout. Minimizing disruption is part of how we plan the work.
A clear schedule and honest communication are the baseline we hold ourselves to.

The Result Reston Homeowners Are Looking For

When the addition is complete, it should be indistinguishable from the rest of the home in terms of finish quality, structural integrity, and how it reads from the street. Rooflines match, materials are consistent, and the new space connects to the existing floor plan in a way that feels considered rather than appended.

Contact DLA Design & Build in Reston

If you are planning a home addition in Reston, VA and want to know what your parcel's Fairfax County setbacks and your cluster's standards will actually allow, we are a straightforward conversation away.
Reach out and we will start with the specifics of your property.